1.2 TWhdata-centre electricity · 1.5% of national generation · grade B, Derived

Finland's data centres draw 1.2 TWh of electricity a year, which places it 28th of the 33 countries this atlas carries a figure for.

That is 1.5% of everything the country generates — above the 1.2% median across those countries.

Set against 0.3 GW of installed capacity, that implies a 49% load factor.

One metro is tracked here: Helsinki, at 190 MW and under construction.

190 MW of that is not yet operating: it is under construction or still an announcement.

Its strongest showing anywhere in the atlas is Power & Grid on the control basis, at #11 of 12.

It does not register at all on Silicon, Memory & Storage or Networking.

One supplier is domiciled here, Wärtsilä, booking roughly $7bn.

Its single strongest grip on the buildout is On-site power & backup, where firms domiciled here hold 8% of global supply in a sub-layer weighted 0.45 for how hard it is to substitute.

About $2bn of AI infrastructure investment has been announced for Finland, though announced is not built — that figure is graded C.

National context

Electricity generation82 TWh A
Data-centre electricity1.2 TWh B
— as a share of generation1.5% B
Installed data-centre capacity0.3 GW B
Tracked metro capacity190 MW B
Announced investment$2bn C
Population5.6m A
GDP$317bn A

Where Finland ranks

The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.

Tier Physicalassets here Ownershiprevenue booked Controlcould stop you
Silicon———
Memory & Storage———
Networking———
Systems & Facility#28of 54——
Power & Grid#29of 77#14of 17#11of 12

Data centre metros (1)

Helsinki — Under constructionWaste heat recovery into district heating is standard practice.190 MW C

Supply positions

Share of each global sub-layer held by firms domiciled here, and how hard that sub-layer would be to substitute. Those two multiplied are what the control basis ranks on.

Power & Grid

Sub-layerShareSubstitutability
On-site power & backup8% C×0.45

Strongest single grip: On-site power & backup — 8% × 0.45 substitutability weight.

Suppliers domiciled here (1)

Wärtsilä — Balancing enginesPower & GridGrid-balancing engines increasingly contracted against DC load.$7bn

Revenue is the group or segment figure closest to each tier's perimeter. Segment boundaries differ between issuers, so treat the split as indicative.

Open Finland in the interactive atlas →

Every figure here is computed from the same tables the atlas reads, and is downloadable as CSV. Think something is wrong? Tell me — corrections are more useful than compliments.

Other countries

All countries →