Norway's data centres draw 1.4 TWh of electricity a year, which places it 24th of the 33 countries this atlas carries a figure for.
That is 0.9% of everything the country generates — below the 1.2% median across those countries.
Set against 0.3 GW of installed capacity, that implies a 53% load factor.
One metro is tracked here: Oslo, at 220 MW and announced.
220 MW of that is not yet operating: it is under construction or still an announcement.
Its strongest showing anywhere in the atlas is Power & Grid on the physical basis, at #25 of 77.
It does not register at all on Silicon, Memory & Storage or Networking.
About $2bn of AI infrastructure investment has been announced for Norway, though announced is not built — that figure is graded C.
National context
Where Norway ranks
The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.
| Tier | Physicalassets here | Ownershiprevenue booked | Controlcould stop you |
|---|---|---|---|
| Silicon | — | — | — |
| Memory & Storage | — | — | — |
| Networking | — | — | — |
| Systems & Facility | #27of 54 | — | — |
| Power & Grid | #25of 77 | — | — |
Data centre metros (1)
| Oslo — Announced | 220 MW C |