Poland's data centres draw 1.4 TWh of electricity a year, which places it 25th of the 33 countries this atlas carries a figure for.
That is 0.8% of everything the country generates — below the 1.2% median across those countries.
Set against 0.4 GW of installed capacity, that implies a 38% load factor.
One metro is tracked here: Warsaw, at 190 MW and under construction.
190 MW of that is not yet operating: it is under construction or still an announcement.
Its strongest showing anywhere in the atlas is Power & Grid on the physical basis, at #26 of 77.
It does not register at all on Silicon, Memory & Storage or Networking.
About $2bn of AI infrastructure investment has been announced for Poland, though announced is not built — that figure is graded C.
National context
Where Poland ranks
The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.
| Tier | Physicalassets here | Ownershiprevenue booked | Controlcould stop you |
|---|---|---|---|
| Silicon | — | — | — |
| Memory & Storage | — | — | — |
| Networking | — | — | — |
| Systems & Facility | #29of 54 | — | — |
| Power & Grid | #26of 77 | — | — |
Data centre metros (1)
| Warsaw — Under construction | 190 MW C |