Atlas of AI Buildout

Atlas / Countries / Poland

Country

Poland

Data centre capacity, electricity and supply-chain position · ISO PL

1.4 TWhdata-centre electricity · 0.8% of national generation · grade B, Derived

Poland's data centres draw 1.4 TWh of electricity a year, which places it 25th of the 33 countries this atlas carries a figure for.

That is 0.8% of everything the country generates — below the 1.2% median across those countries.

Set against 0.4 GW of installed capacity, that implies a 38% load factor.

One metro is tracked here: Warsaw, at 190 MW and under construction.

190 MW of that is not yet operating: it is under construction or still an announcement.

Its strongest showing anywhere in the atlas is Power & Grid on the physical basis, at #26 of 77.

It does not register at all on Silicon, Memory & Storage or Networking.

About $2bn of AI infrastructure investment has been announced for Poland, though announced is not built — that figure is graded C.

National context

Electricity generation173 TWh A
Data-centre electricity1.4 TWh B
— as a share of generation0.8% B
Installed data-centre capacity0.4 GW B
Tracked metro capacity190 MW B
Announced investment$2bn C
Population36.5m A
GDP$1,036bn A

Where Poland ranks

The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.

Tier Physicalassets here Ownershiprevenue booked Controlcould stop you
Silicon———
Memory & Storage———
Networking———
Systems & Facility#29of 54——
Power & Grid#26of 77——

Data centre metros (1)

Warsaw — Under construction190 MW C
Open Poland in the interactive atlas →

Every figure here is computed from the same tables the atlas reads, and is downloadable as CSV. Think something is wrong? Tell me — corrections are more useful than compliments.

Other countries

All countries →