Spain's data centres draw 2.4 TWh of electricity a year, which places it 16th of the 33 countries this atlas carries a figure for.
That is 0.8% of everything the country generates — below the 1.2% median across those countries.
Set against 0.7 GW of installed capacity, that implies a 38% load factor.
One metro is tracked here: Madrid, at 450 MW and under construction.
450 MW of that is not yet operating: it is under construction or still an announcement.
Its strongest showing anywhere in the atlas is Power & Grid on the ownership basis, at #11 of 17.
It does not register at all on Memory & Storage or Networking.
2 suppliers are domiciled here, booking roughly $16bn between them; the largest is Iberdrola.
About $6bn of AI infrastructure investment has been announced for Spain, though announced is not built — that figure is graded C.
National context
Where Spain ranks
The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.
| Tier | Physicalassets here | Ownershiprevenue booked | Controlcould stop you |
|---|---|---|---|
| Silicon | #14of 14 | — | — |
| Memory & Storage | — | — | — |
| Networking | — | — | — |
| Systems & Facility | #19of 54 | — | — |
| Power & Grid | #17of 77 | #11of 17 | — |
Data centre metros (1)
| Madrid — Under constructionOne of the markets JLL identifies as broadening Europe's centre of gravity away from FLAP-D. Fast-growing on cheap renewables. | 450 MW C |
Suppliers domiciled here (2)
| Iberdrola — Generation and networksPower & GridUtility, included for network build scope. | $15bn |
| Ingeteam — Power conversionPower & Grid | $1bn |
Revenue is the group or segment figure closest to each tier's perimeter. Segment boundaries differ between issuers, so treat the split as indicative.