Data centre capacity, electricity and supply-chain position · ISO TR

1.2 TWhdata-centre electricity · 0.3% of national generation · grade B, Derived

Turkey's data centres draw 1.2 TWh of electricity a year, which places it 30th of the 33 countries this atlas carries a figure for.

That is 0.3% of everything the country generates — below the 1.2% median across those countries.

Set against 0.3 GW of installed capacity, that implies a 39% load factor.

One metro is tracked here: Istanbul, at 120 MW and under construction.

120 MW of that is not yet operating: it is under construction or still an announcement.

Its strongest showing anywhere in the atlas is Power & Grid on the physical basis, at #31 of 77.

It does not register at all on Silicon, Memory & Storage or Networking.

About $2bn of AI infrastructure investment has been announced for Turkey, though announced is not built — that figure is graded C.

National context

Electricity generation354 TWh A
Data-centre electricity1.2 TWh B
— as a share of generation0.3% B
Installed data-centre capacity0.3 GW C
Tracked metro capacity120 MW B
Announced investment$2bn C
Population85.8m A
GDP$1,597bn A

Where Turkey ranks

The same tables read three ways. A country can lead one basis and be invisible on another, and that gap is the whole point of the atlas.

Tier Physicalassets here Ownershiprevenue booked Controlcould stop you
Silicon———
Memory & Storage———
Networking———
Systems & Facility#38of 54——
Power & Grid#31of 77——

Data centre metros (1)

Istanbul — Under construction120 MW C
Open Turkey in the interactive atlas →